Monday, December 23, 2019

Electrics on 27ft Sportfisherman "Dedication"

In my last post we had finished pulling cables and hoses through the ducts to their connection points. Most of the cables ended inside the console, coming up from the ducts under the deck. Also into this area came two hydraulic hoses for steering.
A mess of wires and hydraulic hoses, waiting to be connected.
One side wall inside the console is given over to battery switches, breakers and busbars. These were pre-mounted onto a Starboard panel, then the panel was mounted into the console for wiring.
Battery switches, breakers, busbars etc being laid out on the Starboard panel before mounting in the console.
`The main switch panel is mounted under a hinged cover on the outside of the console alongside the helm. This panel was pre-wired with the positive cables, ready for connecting to the power busbar and clearly labelled.
Switch panel pre-wired and ready for mounting in the console.
With those panels in place, Kevin has been closeted inside the console making all of the connections. All connections are soldered then sealed with heat shrink tubing. All wires are clearly labeled with their purposes to help with later maintenance and fault-tracing.
Wiring in progress. The hole in the side of the console at bottom left below the panel connects to the mounting of the starboard forward leg of the tower. Controls for the crows nest helm will run up this leg and through the hardtop.
Switch panel to the right of the helm, protected by the hinged cover. The ignition switch will be in the open space just to the left of the switch panel. Engine throttle and gearshift will be to the right of the helm.
Making some of the hose connections to the tanks, seacocks and pumps can be challenging. Some of them are awkward to reach and to manipulate the hose, clamp and screwdriver one-handed. Long slim arms and supple hands are a big benefit.
This compartment contains the black water holding tank on the left and the fresh water tank on the right. The black fitting against the other side of the compartment is the Y-valve to control output from the holding tank to either the pump-out or the seacock. Inside this compartment there are five 32mm hose connections, two of 1" and two of 3/4". The order of connecting must be planned because some of the hoses block access to other fittings if done first. 
This design is not yet on our website. Visit our main website or our mobile website to see our other designs.

Tuesday, October 29, 2019

27ft Sportfisherman "Dedication"

Launch day gets closer for the amateur project 27ft sportfisherman of Kevin Agee. Aside from the physical progress on the boat, she has also been given a name. She will be named "Dedication" for the commitment that Kevin put into building a high quality boat. That will also be the design name, when I can get around to completing the drawings.

Since my last post we have installed the fuel tank. Kevin has painted the cockpit and deck and connected the fuel filler hose. On Sunday we fitted the cockpit access covers over the fuel tank connections and installed the centre console and leaning post.
Deck & cockpit painted, fuel tank installed. The grey areas are a sprayed non-skid and the white areas are gloss. Rod holders have been installed in the side decks. The two immediately aft of the sheer break each side will hold the bait board supplied by Australian company Stainless Boatworks.
Flush panel over fuel tank, with access covers over connections.
View of aft end of cockpit. Insulated fish box is in the centre, with a locker each side for access to bilge pumps and fish box drain controls. The cockpit drains are at the ends, draining under the lockers then through the transom below the stern platform.
Console and leaning post installed. Each has access to the hinged cover inside, over the tank plumbing.
The leaning post has a large bait tank and aft-facing seat. The bait tank has semi-circular ends to allow the water to swirl rather than splash when surging from wave action.
All painted except for varnishing the toerails.
Work has been ongoing on the tower. Assembly of the tower on the boat will start next week. When the tower, hardtop and crow's nest are complete she will go to the engine shop to have her engine mounted on the bracket.

This design is not yet on our website. To see our design range go to our main website or our mobile website.

Wednesday, May 15, 2019

27ft Sportfisherman

I may not have been paying enough attention when I started posting about the 26ft sportfisherman project of Kevin Agee. When we first discussed this proposed design it was to be about 26ft, so that was what I called it. But it grew a bit between first discussions and agreeing the final lines. It is actually a bit over 27ft from stem to transom, so it is now the 27ft sportfisherman project. And that project is now moving into the final finishing stages.

Having glassed the console, next we took a skillsaw to it. That was not to destroy it but to form a concealed switch panel with hinged cover to protect it from the elements.
Console after cutting to form the switch recess. The removed part will be used to form a hinged cover.
This is the infill piece that will fill in the hole in the console, with the switches mounted in the horizontal surface. We made this from 15lb Coosa Board.
The infill piece has been glued into the console. When finished it will hold the electrical switches, including the key-switch for ignition. 
Work has also started on fairing and priming the deck and rubrails to ready them for final painting.

After two coats of high-build epoxy applied by roller, the deck is ready for sprayed fairing compound.
Kevin took delivery of his new double-axle trailer, which had been set up by the supplier to suit the hull bottom. We jacked the boat with trolley jacks, supporting it on boat stands and axle stands, then dismantled the cradle from underneath. Pushing the trailer in under the boat was an interesting process, with trolley jack and axle stand playing leapfrog with trailer frame and axles.
New double axle trailer.
Jacked and supported on boat stands and trolley jack, the cradle was dismantled.
Safely on its trailer, the new boat came out of its shed for the first time.
Showing its lines in daylight.
For the first time we are able to step back and look at the transom and engine bracket.
Launch is still a few weeks away. Plans won't be available until after she is wet and has done some sea-trials. See our full range of designs on our website or mobile website.

Sunday, April 7, 2019

Back to Building a Sportfisherman

I had to take an enforced break from working with Kevin Agee on his 26ft sportfisherman for a couple of weekends, the result of a very minor injury that tried its best to become a much bigger issue. Now I am back to help him as he approaches completion of his new boat.

Work on the console and leaning post has continued.
Console structure completed, with Coosa Board for the instrument and helm surface, plywood elsewhere.
Front view of console. The opening will have a door for access to the instrument wiring and batteries.
Leaning post structure completed. Helm seat is on the left and an aft-facing seat on the right, with the live bait well under the aft seat. The hole in the side is for a tackle box and the other side will have a refuse bin.
Inside view of the live bait well. The rounded ends were made with laminated plywood half-pipe sections and allow the water to swirl or flow smoothly rather than splashing back and forth between hard corners.
Framing for cabin hatch.
Cabin hatch cover. It will be hinged at the front.
The tumblehome rail, dry-fitted to set up the alignment. This is two layers of high-density Coosa board, cut to a trapezoidal section and tapered toward the front. It will be glassed before fitting and will have a stainless steel capping.
The underside of the rubrail has been faired to a large radius against the hull in the bow and will now be glassed along with the decks. The glass will be lapped onto the hull, which has been ground back to glass for a good bond.
Today we glassed the console and leaning post with a layer of 8oz woven glass. 
The side decks aft of the sheer break and the aft deck have also been glassed, with a layer of 1708 stitched fabric. Doing the same to the side decks forward of the break and the foredeck is scheduled for the next week or two.

This design won't be on our website until after Kevin's boat is launched. See our range of other designs on our main website or our mobile website.

Monday, March 11, 2019

Sportfisherman Fish Box & Centre Console


After a period of laborious filling/sanding/fairing/sanding/fairing//sanding/painting, when it seems to the outside observer that nothing much seems to be going on, Kevin Agee's boat is back into a phase when progress appears to be going apace. Various projects are going on simultaneously. The foredeck has been glued on, the fish box lid has been formed, the rubrails have been glued on, the intermediate rails have been dry-fitted to fine-tune final position and the centre console is being assembled. See the captions under the photos for explanation.
Nicely faired and sprayed interior of the cuddy cabin. The foredeck has been glued on and is still to be filleted around the edges. The bright white interior will help with keeping this area clean and habitable. It will have a small seat each side and a WC between them.
The fish box lid has been made from multiple layers of Coosa Board, formed to the camber of the aft deck. The lid will be in two halves, hinged at the centre.
View of the underside of the lid. The white lines are epoxy filling the kerfs that were cut into the lower surface to help with bending to shape while gluing it over a former. The cover will be glassed top and bottom. The rebate around the perimeter allows it to lie flush in the aft deck.
In the foreground are the sides of the aft unit of the centre console, formed with plywood sides and laminated plywood radiused corners. This will form the seats and the live bait well. In the background are the sides of the forward unit, which will house the steering, engine controls and instrumentation.
Pre-formed corners of the console are laminated plywood to 15mm total thickness. The flat panels are 9mm plywood, so rebates have been cut 9mm deep and 20mm wide for gluing the flat panels to the corners.
Aft unit of centre console in position in the cockpit. This is the "leaning post" or seat unit. The forward side is the elevated helm seat, above storage. The aft side is the live bait well with an aft-facing seat over it.
The rubrails have been glued on and must still be shaped, then glassed along with the sidedecks. These are all Coosa Board, a lightweight board for the decks and a more dense board for the rubrails. The intermediate rail is oak and has been dry-fitted for fine-tuning for best aesthetics.
This design is not yet on our website. To see our full range of designs, go to our main website or our mobile website.

Thursday, February 14, 2019

26ft Sportfisherman Stern Detailing

Cockpit work continues on Kevin Agee's 26ft sportfisherman project. The photos tell the story.
Gluing in the cleats around the top of the fish box to support the lid. Many operations in boatbuilding demand hoards of clamps. This is one of them because the cleats must be bent into shape during fitting and held there until the glue cures. The cleats were glassed on exposed surfaces before fitting.
The cleats all done and the Coosa Board deck panel and fascia glued on.
In the corners of the transom, outboard of the fish box, are lockers. In this photo the opening for the door has been cut. The boxing on the left is the duct to take water through the locker to the transom drain. The ball valve is the drain for the fish box and will connect to the hole in the vertical face of the duct, to drain the fish box directly into the drain.
View of the fish box and lockers nearing completion. The doors are dry-fitted and will be installed after painting is completed.. The Coosa Board fascia has been glued on. The cockpit drains can be seen at each end of the toe recess.
The corners are rounded to soften the look of the cockpit and also for comfort when leaning against the decks while working fish. We accomplished this by cutting layers of Coosa Board to equal the height of the fascia. They will be glued in, then glassed over and faired along with the decks and fascias. This is the intersection of the side deck with the fish box.
Same detail at the intersection of the side deck with the foredeck. The foredeck will be fitted after completion of painting the cuddy cabin. The deck has already been glassed and painted, ready to be glued in place on the framing.
Deck stringers seen from below, showing how they are framed into the sheer clamp. These stringers are curly maple and have been precoated with epoxy and will be clear-finished with varnish. The underside of the deck is white-painted.
Also in the cuddy cabin, this box has been glued to the bulkhead to form a step. The opening takes a single drawer tackle box.
Work is about to start on constructing the centre console and leaning post. I am busy on that drawing and the cutting will start next week. A 200 litre live bait well is incorporated into the seat aft of the leaning post.

This design is not on our website yet but you can see our other designs on either our main website or our mobile website.

Sunday, January 27, 2019

26ft Sportfisherman Fish Box & Side Decks

The fish box of Kevin Agee's 26ft sportfisherman is progressing nicely. When planning this part of the boat the conflicting needs for efficient cockpit drainage, storage lockers, access to seacocks and maximising fish box capacity must be worked out and different solutions might be settled on for different boats. For Kevin's boat we have constructed the insulated fish box across most of the transom width, with a locker at each and and a toe-kick recess at the bottom.

The choices for the cockpit drains were going through the sides of the hull forward of the fish box, fitting drain pipes through to the transom or building ducts for the same purpose. We chose to build ducts as a good way to have large capacity drains while also being able to shape them to go around the access covers over the compartments below. This also allowed us to hide the drains under the wings of the outboard engine bracket on the outside and in the toe-kick recess of the lockers on the inside.
Basic fish box structure roughed in. The gaps at the ends of the toe-kick recess are for the drains.
Plywood components forming the ducts to feed water through to the transom drains.
Completed drain duct. The large hole will be covered by an access cover. The ball valve is for the fish box drain and will connect to a spigot into the duct.
Fish box constructed with plywood liner and foam slab insulation. Epoxy filleted at all corners.
The side decks were next on the build list. This started with fitting the light framing that defines the shapes of curves of the upper and lower edges of the side deck fascias. With these glued in and held to their required shapes by the side frames and gussets, the fascias were cut and fitted first, followed by the side decks. I was designing for this work to be done in marine plywood but this can be replaced by Coosa board. Kevin has chosen to do the decks in Coosa, fibreglassed both sides.
Cleats at top and bottom of the fascia define the shapes of fascia and deck. We added two gussets between frames, to shape the sheer break and to hold the cleats parallel to the sheer curve where it turns in aft due to the tumblehome.
At the sheer break the relatively straight aft cleats (glued in first) must be held firmly in their correct positions, so that the heavily curved forward cleats can be trimmed to come in at the correct angle and position, then glued. This is done with the gusset seen in the photo, which stays in place as permanent structure.
Coosa fascia and side deck dry-fitted to test for it. The fascias were cut as straight strips then flexed into place. The side decks were cut to the required shapes. All panels were then glassed on the back face before fitting.
The fascia is already glued on. The side decks have been glued, held in place by clamps along the inner edge and by screws with fender washes along the sheer.
Lots of clamps needed for this job. Screws with fender washers do the job on the outer edge where clamps cannot work. Kevin is cleaning up the excess glue on the underside of the deck. 
The foredeck has been cut to shape and is ready to be fitted. That will happen after painting of the cuddy cabin has been completed.

This design won't be on our website until close to launch time, so that any decisions taken during the build will be shown on the drawings that we sell. See our other designs on our main website or our mobile website.